I am trying to verify the results obtained by modal analysis and response analysis of a G+4 RC hill Building with the base paper results but unfortunately couldn`t. Although I have followed all the steps, the obtained Time periods (T1,T2, T3) are 1.88, 1.77, 1.47 sec while in the base paper its values are 0.51, 0.59, and 0.446 sec. In the case of the mass participation factors values are 0.75, 0.85, 0.78 (approx.) while in the base paper, these are 0.988, 0.548, 0.446 as compared to the base paper which I want to verify.

So, may anyone explain the possible error? I am using a cracked version of SAP2000.

More Dharmendra Kushwaha's questions See All