Hi all,
Greetings. I am modelling a catchment using Arcswat 2012 with many floodplains which i consider as reservoirs in the model. I have calculated all characteristics of reservoirs (floodplains) and the simulated discharge seems fine as the reservoirs clearly have an influence on the peak discharges. However when i look at the output file i noticed the following:
TILE FROM IMPOUNDED WATER = 0.000 (MM)
EVAPORATION FROM IMPOUNDED WATER = 0.000 (MM)
SEEPAGE INTO SOIL FROM IMPOUNDED WATER = 0.000 (MM)
OVERFLOW FROM IMPOUNDED WATER = 0.000 (MM)
When I increase the hydraulic conductivity to 1mm/hr, it give the same output as above.
Could someone explain to me where i have gone wrong? I am using Arcswat2012 (version ArcSWAT 2012.10.2.17).
Elias