Have you faced such a problem?

If yes, please suggest how was the problem rectified. 

Its a new equipment, being used for the first time. Under programme block 1, the initial switch time is fixed at 60 secs, final at 120 secs and total run time at 24 hrs. Other parameters are as desired, but even other parameters are fixed.

We are optimising the PFGE work. In the trial 1 we did get results, though would like to optimise a bit more. 

More Dr. Godfred A. Menezes's questions See All
Similar questions and discussions