good afternoon sir,
you find this text in healthy situation, i hope so. sir i want to know that if we have data of two teams and use that data for revised target after rain interruption. used method in whole situation is right or not/ how mach valid.
Q 1: what statistical test used to check the validity of used method?
Q 2: how to use overs left, wickets in hand in your recommended test, in answer of 1st question?