can anyone tell me why my pushover curve isn't reaching the collapse point?? and why it is not able to complete the steps; I only get 17 steps out of 100!!
I'm using sap2000 with controlled displacement up to 1 m.
By increasing the tolerance, pushover curve reaches to collapse point but every alteration in tolerance level has a significant effect on the pushover curve.