Hello:
I am going to collect data from 5 construction sites to check the relationship and impact between/of different factors (safety climate, psychological contract, safety behavior and safety outcomes). Three of these four factors will be measured by perceived Likert Scale and another factor safety outcomes will be measured by a numeric scale. The numeric scale will be developed through a weighted scale (please see attached) from 1-10. All the other perceived scale will be used also from 1-10 likert scale. But in case of numeric scale I will have only 5 set of data (safety outcomes scale data from 5 construction sites) whereas for other factors I may have 400-500 data set from workers on 5 construction sites.
1. Do you think I can do acceptable analysis and result from these data sets?
2. What are the analysis I can do and could you please give me some references where this type of study is conducted?
3. I will have around 50 questions in my questionnaire for the first three factors. Is it alright to have this number of questions for SEM analysis?
Thank you so much for your patience reading. Looking forward to your answers.
Tanvi