What is the minimum number of samples needed for determining source apportionment of PM through Factor analysis. I have chosen four representative sites(commercial, Industrial,Residential, Bus terminal) from Dehradun(300 sq.km).I have gone through Henry et al., formulae..but still,I have a doubt whether 30 samples from each site is needed or a total of 30 from all sites combined.