Hello Community,
unfortunately, I have experienced trouble with estimating my model in IBM SPSS AMOS for my master thesis. My research design is a 2x2-Between-Subject-Design. As you can see in my model, the variables LUX and OKO are dummy variables resembling all for conditions. On top of that, I have two variables KS and PS moderating the effects of both dummies.
All rectangle variables are observed variables and all eclipse variables are latent.
It would be a tremendous help if someone can answer me the following questions:
Thank you all very much!