I would like to know please what is the best way to plot curve to calculate IC50.
for 3 drugs, FRET kinase binding assay was performed through a service provided by a company, as those 3 drugs are supposed to inhibit certain kinase. The results were in the format of inhibition % under different or multiple concentrations (100uM, 50uM,10uM, 5uM, 1uM, 0.1uM)
what I need to know,please, is it better to plot the inhibition % on y-axis, against what? the multiple concentrations or the log(concentrations).???
The point is that i need to calculate IC50 and Hill slope ? so which way is supposed to be plotted for each of the IC50 and the Hill slope.??
Thanks a lot