Wet runway refers to an airport runway whose surface area is covered with moisture or deep water of no more than 3 mm within the length and width of the runway being used or planned to be used. Currently, the type of pollutants, the maximum depth of pollutants and the coverage rate of pollutants are often used as indicators for evaluation. Are there any other effective evaluation indicators? And how to build the evaluation system?