My team and I have been assigned to produce a layout of a production line of a manufacturing company by using WITNESS 14. The layout of the production line has been done. However, we are currently having problem to allocate the labour to take the parts from the shelf and move it to the machines. We have been told that it required some coding to control the action of the labour. Enclosed is the layout of the production line we drawn for this project.

Thanks for the reply.

More Muhammad Fuad Hadi Abdul Fatah's questions See All
Similar questions and discussions