During flood, the people are shifted to Relief Camps on high lands, which are also also normally surrounded by flood water and the digging of pit latrine (temporary option) is very difficult due to less unsubmerged areas and high subsoil water level.
Also. the accessibility of existing options for the people living in higher floors (in case of multistoried RCC buildings) becomes an issue.
In such situation, what could be the best technological option to address the issue?