Hello,
I have a non-linear regression model of a first order ODE in which 6 dependent variables are estimated parallel. If I want to calculate an information criterion such as Akaike, can I simply sum up the individual variance of each dependent variable's residual or shall I calculate the variance of all dependent variable's residuals at once?
Best,
Dennis