Plumb concrete is normally accepted for massive concrete works in which stone pieces of larger sizes are added along-with normal concrete to achieve economy. The proportion of concrete with stones depends on may factors like size of member, availability of reinforcement, size and shape of stone , grade of concrete. Normally, proportion of concrete may be 30 to 60 % of total volume. Is there are standard norms or design procedure?