I used a rainfall-runoff model to study catchment hydrology and got time-to-peak [hour], peak discharge [cms], and hydrograph duration [hour] for several catchments. Is it possible to construct hydrographs using these three inputs?
I assume some optimization methods are required to create specific shapes of hydrographs...Any ideas which curve should I use and how to create it?