Normally, UC works on intervals of 1hr, so day ahead UC results can be acheived while ED works on 15min interval. My idea is to do UC for day ahead to find scheduled generators and then do ED for 15 min interval but my problem is related to multi area coordination. If my idea is yet correct, this could create a very complex coordination problem. If my idea is wrong, please guide me and suggest the right way. So how UC and ED should be combined that satisfies the basic concepts of these two?