Utility System Operators in a decentralized energy markets accepts bids from Independent Power Producers IPP to meet the Demand in a timely basis. This is a known story, but interesting will be what algorithm they use or the logic they follow to reach a cost effective as well as considering carbon footprints emission restrictions. I would like to know whether there exists any such algorithm for utility system operators? Would be great, Thank you.