I prepared a model for soil pile interaction. The model was arranged in three dimensions. When I want to perform geostatic analysis, the following warning appears. In the analysis, it gives a time incremet error.
How can i solve this problem? Thanks in advance for those who are interested.
A geostatic procedure with maximum displacement tolerances is supported only for the following materials: elastic, porous elastic, extended cam-clay plasticity model and mohr-coulomb plasticity model. In general, the use of other materials with this procedure may lead to poor convergence or no convergence of the analysis.
A geostatic procedure with maximum displacement tolerances is supported only for continuum elements with pore pressure degree of freedom and the corresponding stress/displacement continuum elements. In general, the use of other elements with this procedure may lead to poor convergence or no convergence of the analysis.