Peat harvesting requires draining the peatland. This is done by digging large ditches and allowing the site to drain. What would be the total volume of water (in m 3 ) drained from one ditch in 1 day?
You have the following information:
· The water table (upside down triangle) is maintained at 30 cm below the surface and
follows the surface
· The ditches are 30 m apart (i.e., from centre to drainage ditch is 15 m)
· The edge of the ditches are 10 cm lower than the centre of the field
· The ditch is 100 cm deep and 250 m long
· The hydraulic conductivity of the peat is 5.0x10 -4 cm/s (0.0005 cm/s)
· There is no vertical loss (recharge or evaporation) in the ditch
· The system is underlain by impermeable clay