Researchers have used simulated sediment yield at the sub-watershed outlet as a measure to prioritize area for targeting of BMPs. The results of this ranking of sub-watersheds (based on absolute sediment load at their own outlet) may not essentially similar to ranking area based on the sediment yield at watershed outlet.
My goal is sediment yield reduction entering reservoir dam. Therefore, i need prioritization method based on contribution of sub-watershed on the sediment yield at watershed outlet (or entering reservoir dam).
Do you have any suggestion for my goal (prioritization of sub-watershed based on their share to the sediment load of the watershed outlet using SWAT)?