I have come under situation where LCOE decreased gradually till around 600kW to 650kW before it increased slightly. Moreover, LCOE intersected at around 500kW- 550kW. There is less MWh curtail within that size, but increased beyond right of that.

Can the intersection point be taken as optimal PV capacity ?

PS: SSEN grid limit is 500kW