4 Questions 5 Answers 0 Followers
Questions related from Prabesh Raj Ojha
I have come under situation where LCOE decreased gradually till around 600kW to 650kW before it increased slightly. Moreover, LCOE intersected at around 500kW- 550kW. There is less MWh curtail...
04 December 2024 5,332 0 View
Grid has export capacity of 1 MW. However, its capacity is not utilized for most of the months. I have been researching the methods to determine the optimal PV size that would make the best...
15 November 2024 4,036 4 View
When we want to integrate solar PV with co-located hydro, which optimization method or process should I follow to determine the optimal PV capacity. The project has grid capacity of 1000kW and now...
04 October 2024 4,364 4 View
Current i am doing some research on energy storage application of dual active bridge converter. I am stuck with a question about the consequence that there might occur if the two voltage source is...
10 January 2023 1,571 1 View