When evaluating a system, do I need to build or simply simulate? Edit
I have a system at hand to evaluate/assess with real data at my disposal. I decided to implement/build in order to 'test' the 'potent' of the system and the results generated. Could this be referred to IMPLEMENTATION or what I did is SIMULATION?
Is simulation a better term and posit than implementation in this case?