For example if the time gap between foundation and wall is short or long then what will be the effect? I am interested in effect on thermal or shrinkage stresses. Please share some relevant articles or material. Thanks
The main effect will be in the elastic shortening, but this will be between the two walls only , because one wall start the shrinkage process before the other .
If you want to minimize the shrinkage or thermal effects between two pours or two batches of concrete, it is necessary to cast the second batch before the initial setting of cement.