Metal sulfide recovery in sulfate reducing bioreactors is a challenge due to the formation of small precipitates with poor settling properties. The size of the metal sulfide precipitates with the change in operational parameters such as pH, sulfide concentration and reactor configuration has been previously studied. The effect of the hydraulic retention time (HRT) on the metal precipitate characteristics such as particle size for settling has not yet been addressed.
Ettringite precipitation to remove sulfate, metals and metalloids from mine effluents is being developed. The link below includes some information on the subject:
Chemical technology can be used in conjuction with other treatment or by itself,depending on site conditions. The optimal process and its efficiency depend on several factors, including flow rate or volume,contaminants and their contaminations,other water parameters,discharge criteria,site access, and sludge disposal options.