There is a steel pipe rack with normal framing system including horizontal and vertical bracing systems, all the connections of the horizontal bracing are defected, for some reasons it is nearly impossible to re-weld the connections without a shutdown for the operation. What are the alternatives for horizontal bracing system? For example adding new members and removing the horizontal bracing members completely as in the portal framing which is an alternative for vertical bracing.

More Amr Abdelhalim's questions See All
Similar questions and discussions