It's my pleasure to inform that we have an ongoing Cyclotron (medium energy) facilities establishment project. Actually we have built a cyclotron vault in the basement which is situated minus 30 feet position from the ground.
Now I am facing in a problem for designing Hot labs and QC labs. We have larger space in the ground floor compared to the basement floor adjacent to the cyclotron vault. Which floor would be the best choice for setting up Hot labs and QC labs? Is there any major problem if we design our Hot labs and QC labs on the ground floor which is 30 feet above from Cyclotron?
Please give your expert opinion. I will be highly grateful to you.