Soil slope is modelled as a mohr-coulomb material. Concrete circular piles are reinforced longitudinally and laterally using embedded elements and placed at the middle of the slope. Tried both with static general and dynamic explicit steps. Analysis gets aborted at a total time increment 0.06, 0.08 etc. Could you please suggest any idea to get results??