Hi,
The simulated peak in HEC HMS model is one day after the observed peak.
The method which i am using:
1. Muskingum method for routing
2. SCS curve number for loss
3. SCS unit hydrograph for Transform method
4. Constant monthly method for Baseflow
I have done changes in certain parameters just to match the peak time so, the NSE is 0.857 but percent bias is 50%.
As i am unable to figure out how to reduce this 50% percent bias.
2nd question is:
What will be the perfect duration for validation w.r.t calibration in general.