Allow me to introduce myself as both a PhD at the University of the Witwatersrand studying the impacts of offshore oil and gas in South Africa. I am preparing a comment for the SOUTH AFRICAN GAS MASTER PLAN: BASECASE REPORT (V01).
Reading the optimism of Response to ‘Burden of proof: A comprehensive review of the feasibility of T 100% renewable-electricity systems the question becomes - what kind of timeframe would be necessary to get this system up and running?
I look forward to your response.
Thanks in anticipation,
Janet