What I am trying to signify here is, in case of power grid of NEPAL (My homeland), the load demand is always higher than the total generations from all Major generating stations (hydro power plants mostly). So, all power plants usually operate in their maximum possible capacity to meet the demand to whatever extends they could (Total load demand is curtailed by load shedding through load dispatch center such that Pd=Pg-Pl).

Now, the problem is, the transmission line loss is still very significant (around 8%) and I originally thought of following the CONCEPT OF OPTIMAL POWER FLOW to minimize the transmission loss. However, under above mentioned condition of generators already being fully utilized, I am finding it hard to rationalize the whole concept of optimization for this case.

Is there still some way I could impose the concept of optimization or optimal power flow under these circumstances?  I hope I have explained the problem clear enough. Any help would be great.

For reference, Attached herewith is the approximated ETAP model of grid itself.

Regards,

Bishal

More Bishal Lamichhane's questions See All
Similar questions and discussions