I am working on my thesis task about basin modeling 1D and 2D. The problem I face is I do not have BHT data as calibration data (I only have VR). Could my models be validated by the method? I use five wells data, and there are only two wells that have temperature data in the form DST temperature. Or is it possible if I use Rock Eval-Pyrolysis data such as Tmax as temperature calibration to replace BHT? Thank you for the answer.

More Aditya Nurfauzi's questions See All
Similar questions and discussions