We used the one step method in the lab to obtain FAME for our GC analysis.
Many time we see varying degrees of evaporation of solvent (BF3 and internal standard) from our test tube during the 1 hour heating.
We tried putting PTFE tape around the thread of the test tube but we have varying success rate.
How would you effectively prevent evaporation of solvent in a screw-capped test tube during heating in a water bath?
See here for the simplified method we used: https://www.ncbi.nlm.nih.gov/pmc/articles/PMC2593112/