There is a gold standard method (G) to measure a continuous variable. But it is costly. A new method (N) was developped and we want to compare with G. We used MAE (Mean Absolute Error), BA plot in addition to error (|N-G|)and error proportion (|N-G| / G) more than certain %.

Now I need help in assessing its repeatability. We have an option of three readings from both N and G. How will we deduce which method has better repeatability/ precision?

More Dr Malay Shah's questions See All
Similar questions and discussions