Hey,
I have a question regarding the structural equation model (appendix 1). As you can see, the factor loading from ImageGP to Intention has a value above 1, while the one from ImageGB to Intention has a negative value. I've read that factor loadings can be greater than 1, and that factor loadings can be negative (factor score indetermination?). However, having both these "issues" at the same time seems a bit odd. Is there any way to deal with these issues?
Best regards and thanks in advance,
Till