Dear community,
I am conducting a series of stepwise linear regression to examine if any IV from the five IVs I am interested in predicts the DV. After controlling for three covariates in the first step, I entered one IV each time in the second step of the regression analysis, so I conducted five stepwise regression in total.
I am concern if this will increase type I error due to the number of regression analyses. If so, how can I control the type I error and ensure the results are valid?