Hello Friends,
In my Abaqus model, I am considering the dynamic loading (say 40s) in explicit analyses where the dynamic loading steps 'have to' be equal to 0.01 s.
In abaqus implicit analyses we can easily adjust the dynamic loading's time increments in step settings.However, I am facing big increments in explicit analyses for the same problem (bigger than 0.01 s increments for loading). Even after changing the " Max.time increment Value:0.01", I am observing that the model skips some loading points having loading step bigger than 0.01 s (the loading step is 0.25 s).
I am a bit aware that mesh size and mass scaling effects the time step in explicit analyses, however changing the mesh size is not really preferred.
Please let me know how can I adjust my dynamic loading step equally to 0..01 s. Thanks.