I have multi-stage data. The ICC is different at all level. Say at stage 1 =0.1, at stage=0.2 and at stage 3=0.3. I want to run melogit regression. Please, which variable should be in random-effect model equation? The one with higher ICC or all?

Thanks!

Similar questions and discussions