I modeled the pipeline system in the waterGEMS software. In this model I have a pipeline with length of 50 KM. We need 722 lit/s in this pipeline. At the Kilometer of 10+000 to 15+000 the ground elevation is higher than the HGL. The program alarm the negative pressure in this location but the discharge flow is desirable and equal to 722 lit/s. Is this possible or it is the program errors?

In this distance the maximum ground elevation is 1632 m and the HGL in this point is 1629 m.