Dear science community,
I added a substance to samples with 2% increment (0 (original), 2, 4, 6, 8, 10%). A regression model combined with measured variables was employed to predict the level of added substance. A RMSE of less than 1% was obtained.
Since RMSE is less 2%, is the RMSE acceptable ? Does an RMSE of less than 1% indicate unstable result in this case?