The base shear forces are too small. Check if you have correctly defined material constant properties such as Young's Modulus, yield stress, etc., and the stress-strain constitutive model.
I think I have defined everything correctly. I have tried on another 15-story building, and this is the pushover curve for that building. I will attached to the Etabs V21.2 File.