i am performing pushover analysis using SAP2000, on a 5 storey RCC building, which is designed for gravity loads. I am facing a problem during the analysis, the building is not getting pushed till the target displacement nor the hinges are yielded beyond IO. This problem is occurring with manually defined hinges as well as with auto hinges.