The impact is crucial, so much so that "public traffic managers" and "logistic service providers" should collaborate to produce a joint design proposal for the total system configuration. Problems arise in such systems when different sub-systems are designed separately, and then "thrown together" after design decisions have been completed. This is both foolish and dangerous. Any part of a system whose impact on the whole will effect functionality, should be included in developing the design for the systems parameters and operations.