Dear all,
I want to reduce the amount of powder, let's say, a half of the optimized one, to be proceeded further by ball-milling.
The parameters that have been optimized are :
- volume ratio of the zirconia balls against the container volume
- container volume
- duration
- speed
which parameters should I maintain, and why?
I was thinking to keep the duration and speed as the optimized value, yet I am in doubt whether to maintain the powder/zirconia ratio or just reduce the powder amount.
thank you very much in advance.