08 December 2022 7 10K Report

Dear all,

I want to reduce the amount of powder, let's say, a half of the optimized one, to be proceeded further by ball-milling.

The parameters that have been optimized are :

- volume ratio of the zirconia balls against the container volume

- container volume

- duration

- speed

which parameters should I maintain, and why?

I was thinking to keep the duration and speed as the optimized value, yet I am in doubt whether to maintain the powder/zirconia ratio or just reduce the powder amount.

thank you very much in advance.

warm regards,

efi