Hi everyone!

What is the best solution for passing TBM from fault zone in hard rock when we have a single shield machine? If we have a different machine, how is the condition? If the condition is more complex (for example in this zone there is inflow water with rate of 400 lit/sec and overburden is 800 m), what is the solution?

Thanks in advance for sharing your experience!