Hi ,
I am working on a model of landfill which has been constructed in phases and one cell is added in each phase. I am using Soft soil creep model and consolidation analysis is to be performed.
I have generated very fine mesh . However the time in calculation is very huge so what are the ways to reduce calculation time without comprising with the accuracy of the model?