I am searching for benefit and more developed methods used to determine the labor productivity in construction, and therefore i want to use this method in the perspective study and determine influencing factors.
An Established method followed in Industry in Time and Motion study.An activity is first broken down into steps and worker is asked to follow the steps to complete the task.This way the time is measured.Again another alternative method is conceived and time is measured.By doing Time and Motion study Labor Productivity can be Incresed.