Hi dear colleagues,

To ensure the stability of the built structures, it will be necessary to make a good geotechnical study of the soil and consequently to adopt a good foundation for them. However, the financial envelope allocated to the project doesn’t allow us to make an adequate geotechnical study of the project. In fact, just after one or two years at most, we notice the appearance of cracks on the walls due to an inadequate selection of foundations or caused by other factors that I don't know. My question is what are the factors determining the minimum number of laboratory and in-situ tests to perform a good geotechnical investigation of soils? If not, are there any standards that require a specific number of tests for making a better geotechnical study of soils?

Thank you in advance