Hello,

Please i really need urgent help for my ARENA simulation i have attached a screenshot of the whole simulation and of the ressources to give you an idea.

Basically i am simulating the production of a product. So i have 10 create for the 10 raw materials, then i assign each of them a different number, to then seprate them through different processes by the help of different decides. Each raw material have a different process time so i build different expression to help me do that.

After the materials finish their respective processes they go to the assembly line. I have modeled the assembly line with a match that's going to match and batch specific raw materials to then pass through an asssembly process. The assembly processes are dependant on one another so the assembly 7 depend on assembly 6 who depend on assembly 5 etc ...

For the operators i have created a set of 2 operators, the same set is utilized for all the processes including the assembly processes. So i have 2 operators for the whole simulation.

The simulation works but the time to create 1 final product is too long and i need to lower it. So i added 2 operators, 3 operators even 30 operators but it doesn't lower the time to make 1 product and i don't understant why, it is stil the same time as if i have only 2 operators. There is my problem i really need to lower the time to make one final product but for some reason adding operators doesn't seem to work which is really weird.

Thank you very much for your time.