A 25km long uniform geometry channel is down stream of a given dam. Under a piping failure the earthen dam got breached (hence a gradual breaching order with time). As a consequence to this the water behind the reservoir started flowing downstream.

Now the question is, what should be my expectation regarding the nature of the maximum velocity at each cross section going from dam axis down stream? Is it that the highest maximum velocity should be at the most upstream part of the channel (and then in a declining trend with distance)?